TV · 05 / 06

Test & Validation

A prototype is only as good as the evidence behind it. We write test plans, build custom fixtures and run the functional, environmental and reliability testing that tells you, honestly, whether a design is ready for the next gate.

1234ABCFIXTURE, EOL TESTDWG RO-4410REV CSCALE 1:1SHEET 1 / 140STROKE 40 · 6 BARDAQ · 32 CHE-STOPDUT · PCBA REV C8× SPRING PROBE · 1.27 MM PITCH

What you get

Deliverables

Every deliverable is yours at every milestone: native files, documentation and physical parts.

  • Design verification test (DVT) plans and reports
  • Custom test fixtures, jigs and end-of-line testers
  • Thermal, vibration, drop and ingress testing
  • Accelerated life and cycle testing
  • Competitive teardown and benchmarking
  • Hardware-in-the-loop (HIL) rigs

Tools & capabilities

Thermal chamber -40 °C to +150 °CElectrodynamic shakerIP spray & dust rigNI / LabJack DAQPython test automation

Typical timeline

2-8 weeks per test campaign

Engagement

Fixed-fee sprint, phased program or embedded team. Compare models

FAQ

Common questions

Are you an accredited certification lab?

No, and we say so plainly. We run pre-compliance and design verification so that formal certification at an accredited lab passes the first time.

Can you benchmark competitor products?

Yes. We regularly purchase, tear down and test competing products, then report on architecture, BOM cost estimates and performance against your spec.

Do you sign NDAs before a first conversation?

Yes. We’re happy to sign yours, or send our mutual NDA the same day you ask. Most first calls don’t need confidential detail, but it’s never a problem.

Next step

Tell us what you’re building.

Share as much or as little as you can. A senior engineer reads every inquiry and replies within one business day, usually with a few sharp questions and a suggested first step.